MARVIN tools
Module 01

Margin Value Analysis

Build calculation graphs for an engineered system, identify the margins between decided values and their thresholds, and quantify what each margin is worth.

Overview Organisation Tutorial Case Studies Literature
01

Overview

The Margin Value Method (MVM) evaluates each margin in a design on two axes: how much performance you would lose if the margin were eliminated, and how much external change the margin can absorb before it is consumed.

Inputs and decisions are connected through calculation nodes into a Margin Analysis Network (MAN). Margins arise wherever a decided value — for example a catalogue selection or a discrete choice — exceeds the threshold required by the design. The tool computes margin metrics for every such pair and visualises them on the Margin Value Plot.

02

The three margin metrics

3

Each margin in the network is summarised by three quantities, computed automatically once the parametric model is built.

Metric 01
Local excess

How much the decided value oversatisfies the threshold, measured as (decided − threshold) / threshold. The visible “size” of the margin.

Metric 02
Impact

The performance loss that would occur if a given margin were eliminated, propagated forward through the calculation network. The cost of carrying the margin.

Metric 03
Absorption

The extent to which a margin is consumed when an input parameter deteriorates to its maximum absorbable value. The benefit of carrying the margin under change.

03

The Margin Value Plot

Impact and absorption are plotted as a bubble chart, with bubble size set by local excess. The four quadrants give a designer a quick read on which margins to keep and which to reduce.

Top-left
High value

Provides change absorption with little performance cost. Keep, and consider growing.

Top-right
Trade-off

Significant absorption, but at a meaningful performance cost. Worth a deliberate decision.

Bottom-left
Low significance

Neither costs much nor buys much. Generally safe to ignore.

Bottom-right
Reduce this

High performance cost, negligible absorption benefit. Prime candidate for redesign.

04

Where to go next